2025 NFL Draft: 15 Interior Offensive Lineman You Should Know Ahead of the 2024 College Football Season

Updated: Jul 29, 2024
The Tampa Bay Buccaneers selected Graham Barton at No. 26 in the 2024 NFL Draft, marking the seventh consecutive NFL Draft where an interior offensive lineman was chosen in the first round. Who are the candidates to make it eight in a row? Here are 15 interior offensive linemen to watch, ranked by total points earned from the 2023 college football season, as we head into summer scouting for the 2025 NFL Draft.

Understanding Block Percentage and Total Points Earned for Offensive Linemen
Block Percentage and Total Points Earned are critical statistical measures in football that assess the impact of each play on a team's scoring potential. These metrics are particularly valuable in evaluating offensive linemen, as they quantify how their actions on the field contribute to the team's ability to score and ultimately succeed.
The Significance of Block Percentage and Total Points Earned in Football Analytics
Block Percentage measures the effectiveness of an offensive lineman in executing blocks during pass protection and run blocking. A high block percentage indicates a lineman's ability to maintain blocks, providing time for the quarterback and creating running lanes for the ball carriers.
Total Points Earned is a comprehensive metric that reflects the overall contribution of an offensive lineman to the team's success. This metric takes into account various factors such as blocking efficiency, penalty avoidance, and performance in critical situations. Offensive linemen with high Total Points Earned are often instrumental in executing successful plays that enhance the team's chances of scoring and winning.
By leveraging Block Percentage and Total Points Earned, analysts, coaches, and fans can gain a more nuanced understanding of how strategic play-calling and individual player performances influence the overall game beyond mere statistical outputs.
15 2025 NFL Draft Prospects To Watch Ranked By 2023 Total Points Earned
DREW KENDALL, C, BOSTON COLLEGE
Total Points Earned: 41.39 (6th)
Points Earned Pass Block: 13.36
Points Earned Run Block: 28.03
All Blown Block RK: 127th
Pass Blown Block %: 2.10%
Run Blown Block %: 2.40%
Summary Analysis: Drew Kendall has been a standout center for Boston College. In 2023, Kendall posted 41.39 total points earned, excelling particularly in the run game. His pass blown block percentage of 2.10% and run blown block percentage of 2.40% indicate solid performance, though there is room for improvement in minimizing blown blocks. Kendall’s overall skill set makes him a critical component of Boston College’s offensive line. He started all 13 games at center and took the field for all offensive snaps in 10 games, contributing significantly to Boston College's ranking of 13th in FBS for rushing yards per game.
JORDAN WHITE, C, LIBERTY
Total Points Earned: 41.25 (8th)
Points Earned Pass Block: 9.19
Points Earned Run Block: 32.06
All Blown Block RK: 12th
Pass Blown Block %: 0.90%
Run Blown Block %: 1.30%
Summary Analysis: Jordan White has been a key player for Liberty's offensive line. In 2023, White posted 41.25 total points earned, with a notable strength in run blocking (32.06 points). His low pass blown block percentage of 0.90% and run blown block percentage of 1.30% highlight his reliability in critical situations. White’s performance is instrumental in Liberty’s offensive productivity. He started all 13 games at left guard, played over 850 snaps, and recorded 31 knockdown blocks, contributing to the team averaging over 30 points and 178.5 rushing yards per game.
MICHAEL GONZALEZ, G, LOUISVILLE
Total Points Earned: 37.25 (25th)
Points Earned Pass Block: 15.03
Points Earned Run Block: 22.21
All Blown Block RK: 13th
Pass Blown Block %: 1.10%
Run Blown Block %: 1.60%
Summary Analysis: Michael Gonzalez has been a strong performer on Louisville’s offensive line. In 2023, Gonzalez posted 37.25 total points earned, grading highly in both pass blocking (15.03 points) and run blocking (22.21 points). His pass blown block percentage of 1.10% and run blown block percentage of 1.60% demonstrate his consistency and effectiveness. Gonzalez’s contributions are vital to Louisville’s offensive efforts.
PARKER BRAILSFORD, C, ALABAMA
Total Points Earned: 36.87 (26th)
Points Earned Pass Block: 19.25
Points Earned Run Block: 17.62
All Blown Block RK: 48th
Pass Blown Block %: 1.20%
Run Blown Block %: 0.80%
Summary Analysis: Parker Brailsford has been a reliable center, initially playing for Washington and transferring to Alabama in the offseason. In 2023, Brailsford posted 36.87 total points earned, with notable performance in pass blocking (19.25 points). His low pass-blown block percentage of 1.20% and run-blown block percentage of 0.80% reflect his reliability. Brailsford’s skills are essential for maintaining Alabama’s offensive line stability. At Washington, he earned first team Freshman All-America accolades and All-Pac-12 Second Team honors, playing all 15 games in 2023 and helping the Huskies to the College Football Playoff National Championship Game.
CANAAN YARRO, C, NEW MEXICO STATE
Total Points Earned: 36.82 (27th)
Points Earned Pass Block: 17.12
Points Earned Run Block: 19.70
All Blown Block RK: 80th
Pass Blown Block %: 1.30%
Run Blown Block %: 0.90%
Summary Analysis: Canaan Yarro has been a consistent performer for New Mexico State’s offensive line. In 2023, Yarro posted 36.82 total points earned, excelling in both pass blocking (17.12 points) and run blocking (19.70 points). His pass blown block percentage of 1.30% and run blown block percentage of 0.90% showcase his dependability. Yarro’s contributions are critical to New Mexico State’s offensive success. He started all 13 games, helping the Aggies' rushing attack average 202.7 yards per game, and contributed to the offensive line allowing only 1.4 sacks per game.
GARRETT DELLINGER, G, LSU
Total Points Earned: 36.63 (29th)
Points Earned Pass Block: 16.78
Points Earned Run Block: 19.85
All Blown Block RK: 63rd
Pass Blown Block %: 1.30%
Run Blown Block %: 1.00%
Summary Analysis: Garrett Dellinger has been a solid guard for LSU. In 2023, Dellinger posted 36.63 total points earned, with significant contributions in both pass blocking (16.78 points) and run blocking (19.85 points). His low pass blown block percentage of 1.30% and run blown block percentage of 1.00% indicate his consistency and effectiveness. Dellinger’s performance is vital for LSU’s offensive line. He started all 13 games at left guard, contributing to LSU's ranking as the only FBS team in the Top 10 for both rushing and passing.
JONAH MONHEIM, T/IOL, USC
Total Points Earned: 36.10 (33rd)
Points Earned Pass Block: 16.25
Points Earned Run Block: 19.85
All Blown Block RK: 103rd
Pass Blown Block %: 1.60%
Run Blown Block %: 1.20%
Summary Analysis: Jonah Monheim has been an outstanding tackle for USC. In 2023, Monheim posted 36.10 total points earned, with notable performance in both pass blocking (16.25 points) and run blocking (19.85 points). His pass blown block percentage of 1.60% and run blown block percentage of 1.20% demonstrate his consistency and effectiveness. Monheim’s skills are essential for USC’s offensive success. He started all 13 games, mostly at left tackle, and was named to the AP All-Pac-12 Second Team.
DONOVAN JACKSON, G, OHIO STATE
Total Points Earned: 34.85 (41st)
Points Earned Pass Block: 16.96
Points Earned Run Block: 17.90
All Blown Block RK: 16th
Pass Blown Block %: 1.50%
Run Blown Block %: 1.20%
Summary Analysis: Donovan Jackson has been a key guard for Ohio State. In 2023, Jackson posted 34.85 total points earned, grading highly in both pass blocking (16.96 points) and run blocking (17.90 points). His low pass blown block percentage of 1.50% and run blown block percentage of 1.20% reflect his reliability. Jackson’s contributions are crucial to Ohio State’s offensive productivity. He has started 26 consecutive games at left guard and earned first-team all-Big Ten honors in 2023.
ARMAND MEMBOU, T/IOL, MISSOURI
Total Points Earned: 33.40 (59th)
Points Earned Pass Block: 13.75
Points Earned Run Block: 19.65
All Blown Block RK: 89th
Pass Blown Block %: 1.40%
Run Blown Block %: 1.10%
Summary Analysis: Armand Membou has been a reliable tackle for Missouri. In 2023, Membou posted 33.40 total points earned, with solid performance in both pass blocking (13.75 points) and run blocking (19.65 points). His pass blown block percentage of 1.40% and run blown block percentage of 1.10% highlight his effectiveness. Membou’s performance is essential for Missouri’s offensive line. He started all 13 games, contributing to an offensive unit that helped the Tigers rush for 200 yards on five occasions.
EARNEST GREENE III, T/IOL, GEORGIA
Total Points Earned: 29.69 (119th)
Points Earned Pass Block: 14.25
Points Earned Run Block: 15.44
All Blown Block RK: 132nd
Pass Blown Block %: 1.80%
Run Blown Block %: 1.40%
Summary Analysis: Earnest Greene III has shown potential as a tackle with positional versatilty for Georgia. In 2023, Greene posted 29.69 total points earned, with contributions in both pass blocking (14.25 points) and run blocking (15.44 points). His pass blown block percentage of 1.80% and run blown block percentage of 1.40% indicate areas for improvement. Greene’s development will be key for Georgia’s offensive line. He was named to the SEC All-Freshman Team and started at left tackle in all 14 games.
SETH MCLAUGHLIN, C, ALABAMA
Total Points Earned: 29.21 (135th)
Points Earned Pass Block: 12.00
Points Earned Run Block: 17.21
All Blown Block RK: 66th
Pass Blown Block %: 1.70%
Run Blown Block %: 1.30%
Summary Analysis: Seth McLaughlin has been a reliable center for Alabama. In 2023, McLaughlin posted 29.21 total points earned, with notable performance in both pass blocking (12.00 points) and run blocking (17.21 points). His low pass blown block percentage of 1.70% and run blown block percentage of 1.30% reflect his reliability as a blocker. McLaughlin’s skills are essential for maintaining Alabama’s offensive line stability. He started all 13 games at center and was named to the watch list for the Rimington Trophy. After the 2023 college football season, McLaughlin transferred to Ohio State.
CLAY WEBB, G, JACKSONVILLE STATE
Total Points Earned: 25.20 (212th)
Points Earned Pass Block: 10.80
Points Earned Run Block: 14.40
All Blown Block RK: 3rd
Pass Blown Block %: 0.90%
Run Blown Block %: 0.20%
Summary Analysis: Clay Webb has been a valuable guard for Jacksonville State. In 2023, Webb posted 25.20 total points earned, with significant performance in both pass blocking (10.80 points) and run blocking (14.40 points). His exceptionally low pass blown block percentage of 0.90% and run blown block percentage of 0.20% underscore his effectiveness and reliability. Webb’s performance is crucial for Jacksonville State’s offensive line. He was named FBS Offensive Guard of the Year by College Football Network and helped his team achieve the fifth-best rushing offense in FBS.
TYLER BOOKER, G, ALABAMA
Total Points Earned: 24.18 (239th)
Points Earned Pass Block: 11.79
Points Earned Run Block: 12.39
All Blown Block RK: 47th
Pass Blown Block %: 1.20%
Run Blown Block %: 1.30%
Summary Analysis: Tyler Booker has been a reliable guard for Alabama. In 2023, Booker posted 24.18 total points earned, with notable performance in both pass blocking (11.79 points) and run blocking (12.39 points). His low pass blown block percentage of 1.20% and run blown block percentage of 1.30% reflect his consistency. Booker’s skills are essential for maintaining Alabama’s offensive line stability. He earned first-team All-SEC honors and started 12 games, contributing 41 knockdown blocks.
LUKE KANDRA, G, CINCINNATI
Total Points Earned: 23.69 (257th)
Points Earned Pass Block: 9.43
Points Earned Run Block: 14.25
All Blown Block RK: 268th
Pass Blown Block %: 2.30%
Run Blown Block %: 1.40%
Summary Analysis: Luke Kandra has been a solid guard for Cincinnati. In 2023, Kandra posted 23.69 total points earned, with contributions in both pass blocking (9.43 points) and run blocking (14.25 points). His pass blown block percentage of 2.30% and run blown block percentage of 1.40% indicate that there is still some room for improvement but also showcase his potential. Kandra’s performance is important for Cincinnati’s offense in 2024. He earned first-team All-Big 12 honors and played a key role in UC's heavy rushing attack.
JOSHUA GRAY, T/IOL, OREGON STATE
Total Points Earned: 19.09 (341st)
Points Earned Pass Block: 8.09
Points Earned Run Block: 11.00
All Blown Block RK: 109th
Pass Blown Block %: 1.90%
Run Blown Block %: 2.00%
Summary Analysis: Joshua Gray has shown potential as a tackle for Oregon State. In 2023, Gray posted 19.09 total points earned, with contributions in both pass blocking (8.09 points) and run blocking (11.00 points). His pass blown block percentage of 1.90% and run blown block percentage of 2.00% indicate areas for improvement. Gray’s development will be key for Oregon State’s offensive line. He was named to the All-Pac-12 Second Team and played in and started the first 11 games of the season.




